Ibrahimpatnam Thermal Power Plant (VTPS) Stage IV — 1 × 500 MW

Power · Completed

Hydro bins, CW pipelines, pump-house piping and vertical pump erection.
Client
BGR Energy Systems
Location
Ibrahimpatnam, Krishna District, Andhra Pradesh
Duration
2006 – 2011
Status
Completed
Capacity
1 × 500 MW
Sector
Power

The project

About the project

At VTPS Stage IV, close to our home in Ibrahimpatnam, KVK Industries fabricated and erected 14 m × 0.7 m hydro bin cells and hoppers, and executed the circulating-water (CW) pipelines in the condenser and pump-house areas — including large meter bends.

The package also covered vertical pump erection and LP pipelines in the pump house, completed between 2008 and 2009.

On site

5 photographs

Next project

Power /1996 – 2000 /TRF

Start a conversation

Tell us about your project — fabrication, erection, piping, tanks or MEP. Our team will respond with the experience of three decades behind every answer.