Power · Completed
TG erection for Units 1 & 2, with fire-fighting and ACW pipelines.
- Client
- BGR Energy Systems
- Location
- Nellore, Andhra Pradesh
- Duration
- 2012 – 2015
- Status
- Completed
- Capacity
- 2 × 660 MW
- Sector
- Power
The project
About the project
For BGR Energy Systems at the 2 × 660 MW TPCIL plant in Nellore (the Gayatri power project), KVK Industries carried out turbine-generator structural erection for both units, together with the plant’s fire-fighting and auxiliary cooling water (ACW) pipelines.