AP Genco 2 × 800 MW Thermal Power Plant — Nelaturu, Nellore

Power · Completed

Pipe racks, bunker cells with SS liners, TG building steel, EOT girders and 4 m diameter MS pipe.
Client
Tata Projects
via Indwell Constructions
Location
Nelaturu, Muthukur, Nellore, Andhra Pradesh
Duration
2009 – 2018
Status
Completed
Capacity
2 × 800 MW
Sector
Power

The project

About the project

Over nearly a decade at the 2 × 800 MW AP Genco plant in Nellore, KVK Industries delivered a broad engineering package for Tata Projects — pipe racks, bunker cells and hoppers with stainless-steel liner fitting, and the heavy structures of the turbine-generator building.

The scope extended to EOT crane girders for the CW pump house, 4-metre-diameter MS pipe work, heavy MS piping and, with BGR Energy, the heavy conveyor structures that feed the plant.