Power · Completed
Pipe racks, bunker cells with SS liners, TG building steel, EOT girders and 4 m diameter MS pipe.
- Client
- Tata Projects
- via Indwell Constructions
- Location
- Nelaturu, Muthukur, Nellore, Andhra Pradesh
- Duration
- 2009 – 2018
- Status
- Completed
- Capacity
- 2 × 800 MW
- Sector
- Power
The project
About the project
Over nearly a decade at the 2 × 800 MW AP Genco plant in Nellore, KVK Industries delivered a broad engineering package for Tata Projects — pipe racks, bunker cells and hoppers with stainless-steel liner fitting, and the heavy structures of the turbine-generator building.
The scope extended to EOT crane girders for the CW pump house, 4-metre-diameter MS pipe work, heavy MS piping and, with BGR Energy, the heavy conveyor structures that feed the plant.